Client: Domestic
Duration: 6 weeks
Location: Irvine
Associated works: Builder, Joinery

Billy McGuire Joinery & Building Red cedar rear extension

Red cedar rear extension complete with new kitchen/lounge, bathroom and utility room in Irvine. Duration 6 weeks.

All trades supplied.

  • Groundworks
  • Steelwork
  • Blockwork
  • GRP fibreglass roof-work
  • Aluminium anthracite grey bi-fold doors, guttering, downpipes & drips
  • Anthracite grey upvc door and window
  • Plasterwork
  • Joinery
  • Plumbing
  • Electrical work
  • All ventilation & insulation installed as per architectural drawings
Related

Related Projects

Back to top