Rear extension, alterations/renovation in Belmont, Ayr. Duration 12 weeks.
All trades supplied.
- Groundworks
- Steelwork
- Blockwork
- Low pitched tile roof-work
- White upvc sliding door and patio doors
- Replace house fascia’s, gutters & downpipes
- Plasterwork
- Joinery
- 2nr Velux windows
- Plumbing
- Electrical work
- All ventilation & insulation installed as per architectural drawings
- Additional lounge, open plan kitchen and ground floor bathroom